Chicago 7th District Police Station

Due to system age, Chicago’s 7th District Police Station’s mechanical, electrical, and plumbing infrastructure required replacement. PBC hired Callan Consulting to design the replacement boiler, chiller, and Uninterruptable Power Supplies (UPS). In addition, CCE provided MEP drawings and construction administration services.
The CCE team has extensive experience in mechanical, electrical, and plumbing infrastructure and building automation systems/controls, enabling seamless project delivery.
Chinatown Library

The Chinatown Library was experiencing comfort cooling issues throughout the facility. Though PBC initially contracted Callan Consulting to deliver a specific scope of work, our team advocated for additional commissioning efforts to validate and expand the scope of work to deliver a proper solution to the Owner. After the retro-commissioning effort, CCE provided the solution, including SMARDT chiller reprogramming requirements and radiant zone separation.
CCE’s extensive commissioning experience assisted the Ownership Group in identifying the appropriate scope of work to ensure chronic building issues were solved. CCE strives to provide a high level of service, not just band-aid solutions, to all Clients.